project object

英 [ˈprɒdʒekt ˈɒbdʒɪkt] 美 [ˈprɑːdʒekt ˈɑːbdʒekt]

网络  工程设计对象; 工程对象

计算机



双语例句

  1. Libraries can be added to a project to provide object and variable sets specific to the users'target runtime environment.
    可以将库添加到项目中,以提供特定于用户目标运行时环境的对象和变量集。
  2. First, it creates a file object from the build file and then creates a new Project object.
    首先,它从构建文件创建一个文件对象,然后创建一个新的Project对象。
  3. Where Ant is only an XML scripting tool, Maven is a general build tool, focused on the notion of a project object model ( POM).
    Ant只是一个XML脚本工具,而Maven是一个普通的构建工具,它关注的重点是一个叫做项目对象模型(POM)的概念。
  4. Customizing the project object model ( POM)
    定制项目对象模型(POM)
  5. To decide whether a project has the right nature, validateProjectNature() calls the hasNature() method on the project object.
    为了确定project是否有正确的性质,validateProjectNature()调用了project对象上的hasNature()方法。
  6. The configuration detail used by Maven to build a project is specified in pom. xml, which defines the Project Object Model for Maven.
    由Maven用来构建项目的配置详细信息在pom.xml中指定,这个文件中定义了ProjectObjectModelforMaven。
  7. Consequently, we use a number of different techniques to identify component licenses, including scanning the POM ( Project Object Model) for Maven based projects, and scanning sources for all projects.
    因此,我们通过若干不同的技术来识别组件的授权情况,其中扫描基于Maven项目的对象模型(POM,ProjectObjectModel)以及扫描所有项目源代码等。
  8. Project loader could not get project object.
    项目加载器无法获得项目对象。
  9. Returns the project object associated with the specified project file.
    返回与指定的项目文件关联的。
  10. Project management is the one which takes engineering project as object and takes enhancing the total benefit of carring out the engineering project construction as purpose.
    项目管理是以工程项目为对象,以提高建设实施整体效益为目标的管理。
  11. Maven projects are defined by a Project Object Model ( POM) XML.
    Maven项目由项目对象模型(POM)XML定义。
  12. Extensibility project object unavailable for project '% 1'.
    对于项目%1,扩展性项目对象不可用。
  13. Project quality control is the core of the construction project object control.
    工程质量控制是建设项目目标控制的核心。
  14. Practical Teaching Based on Project Object Method
    基于项目目标法的实践教学
  15. So the paper was based on the technique of 3-D profile measurement, adopted the grating strips that could project the object's surface, and researched the system calibration algorithm and unwrapping, with the aims of high precision, automation, iteration and convenience.
    本文以三维轮廓测量技术为基础,采用光栅投影测量物体三维轮廓,以高精度、自动化、可重复性、方便快捷为目标,重点对系统标定、解相位进行了研究。
  16. The main function of this module is the creating, updating, deleting, querying of project template object and project template's template task, also includes inserting sub or sibling tasks etc.
    该模块主要负责项目模板对象的创建、更新、删除、查询等操作,以及项目模板的WBS任务树的创建、对任务的更新、升降级、查看、插入子任务、插入兄弟任务、资源分配等。
  17. The paper introduces the design and implement of wireless communication net control system based on a project object.
    本文以一个工程应用实例为对象,详细介绍了无线通讯网控制系统的设计与实现过程。
  18. This thesis studies the resource allocation of project-oriented company from two aspect: the relation of strategic goal and project object; balancing multi-project resource needs.
    本论文从项目型企业战略发展与项目关系和多项目间资源平衡两个方面,对资源方法进行了研究。
  19. How to Improve The Foresight of The General Supervision Engineer for The Control of Project Object
    如何提高总监理工程师对项目目标控制的预见性
  20. According to the characteristics of project object, the article focused on the problems resulting from duplication technology in the process of implementation of enterprise-level information integration, to achieve the promotion of general enterprise capacity.
    本文目的是结合工程应用对象的特点,研究基于复制技术在实现企业级信息集成中存在的问题并寻找出相应的解决方法,实现企业综合能力的提升。
  21. Project template management's duty is the management of reusable project template. The aim of project template is to save the WBS structure, resource's assignment structure of project object so that can reduce repeated working.
    项目模板管理主要负责对可复用的项目模板的管理,其目的是把项目的任务分解结构,资源分配结构等经验性的、可复用的信息保存起来,以减少重复劳动。
  22. Along with china entered the WTO and the building market grown up, the major engineer has became the very important person. In order to ensure the project object completing, the control capacity of the major engineer for the project object is very important?
    随着中国加入WTO和建筑市场的越加规范,项目总监理工程师已成为项目管理的核心,为保证项目目标的实现,总监理工程师对项目目标控制的预见能力尤为重要。
  23. Risk management is the ensuring of achieving of project management object, project management is the prerequisite for effective risk management, the two are inseparable, and only the organic integration of the two projects can contribute to optimization of the project result.
    风险管理是项目管理目标实现的保证,项目管理是风险管理有效进行的前提,两者密不可分,只有将两者有机整合才能促成项目结果的最优化。
  24. Finally, based on the project of object, developed the Collaborative Commerce system for the for the cable industry. Chapter ⅰ described the products 、 product performance, and the production processing of data cable.
    最后结合项目应用示范企业为对象,开发了面向数据电缆行业的协同商务平台。
  25. This paper takes construction project as object, using methods of literature summary and expert interviews, qualitative and quantitative analysis, empirical and normative analysis, proposes a five-stage cycle chain of risk management.
    本文以建筑工程项目作为研究对象,综合采用了文献总结与专家访谈结合、定性分析与定量分析结合法、规范分析与实证分析结合的方法,针对建筑工程项目总结出风险管理五阶段循环链。
  26. College foreign language curriculum design is one large systematic project covering object, target, content, method and evaluation.
    课程设置是一个涵盖教学对象,目标,内容,方法和评价等方面的庞大的计划系统。
  27. The project object thought that it is necessary development, according to the original overall demand view the design of three sub-projects, sub-projects of the proposed start-up and service targets.
    在项目服务对象方面:根据原先总体需求设计三个子项目、及服务对象建议开办子项目,在项目评估对象来看是有必要开展的。
  28. The thesis originates from the project named object recognition in the multi-source image.
    论文所属的课题是多源影像的目标识别。
  29. PDCA circulation principle is applied to safety management and the relation between safety management and traditional engineering project of object management, quality management, schedule management, and cost management is researched.
    将质量管理PDCA循环原理运用到本项目的安全管理中,并研究安全管理与传统的工程项目目标管理质量管理、进度管理、成本管理的关系。
  30. Take a single tower cable-stayed bridge as the project object, using the ANSYS software, the finite element modal analysis and the non-linear time-history analysis has been carried on by different combinatorial seismic input model.
    以一座独塔斜拉桥为工程对象,采用ANSYS有限元分析软件,以不同的地震动组合输入方式进行了有限元模态分析与非线性时程分析。